मंगलवार, 30 अक्तूबर 2012

Launch Vehicles of ISRO


Introduction:

 Launch Vehicles are used to transport and put satellites or spacecrafts into space. In India, the launch vehicles development programme began in the early 1970s. The first experimental Satellite Launch Vehicle (SLV-3) was developed in 1980. An Augmented version of this, ASLV, was launched successfully in 1992. India has made tremendous strides in launch vehicle technology to achieve self-reliance in satellite launch vehicle programme with the operationalisation of Polar Satellite Launch Vehicle (PSLV) and Geosynchronous Satellite Launch Vehicle (GSLV).
PSLV represents ISRO's first attempt to design and develop an operational vehicle that can be used to orbit application satellites. While SLV-3 secured for India a place in the community of space-faring nations, the ASLV provided the rites of passage into launch vehicle technology for ISRO. And with PSLV, a new world-class vehicle has arrived. PSLV has repeatedly proved its reliability and versatility by launching 55satellites / spacecrafts ( 26 Indian and 29 Foreign Satellites) into a variety of orbits so far.
ISRO also makes the Rohini series of sounding rockets used by the Indian and international scientific community to launch payloads to various altitudes for atmospheric research and other scientific investigations. These rockets are also used to qualify some of the critical systems used for advanced launch vehicles. 

Landmark achievements in ISRO's Launch Vehicle Development:



PSLV has 21 consecutively successful flights out of 22 launches


PSLV used for launching a total of 27 satellites for foreign customers under commercial agreements, demonstrating its multi-satellite launch capability


PSLV used to launch Space capsule Recovery Experiment (SRE-1), Chandrayaan-1 and ISRO's exclusive meteorological satellite, KALPANA-1, proving its versatility


GSLV with four successful flights of seven launches can launch 2 to 2.5 tonne satellite into Geo-synchronous Transfer Orbit (GTO)


Successful testing of indigenously developed cryogenic upper stage on November 15, 2007.

ISRO's Launch Fleet at a Glance:





ISRO developed two experimental satellite launch vehicles, SLV-3 and ASLV


Polar Satellite Launch Vehicle(PSLV) commissioned in 1997


Geosynchronous Satellite Launch Vehicle (GSLV-Mk I) commissioned after second successful flight in May 2003


GSLV - MK II will use indigenously developed cryogenic Upper Stage


GSLV - MK III is under development



SLV-3:

 Satellite Launch Vehicle-3 (SLV-3), India's first experimental satellite launch vehicle was successfully launched on July 18, 1980 from SHAR Centre Sriharikota, when Rohini satellite, RS-1, was placed in orbit. SLV-3 was a 22 m long, all solid, four stage vehicle weighing 17 tonnes capable of placing 40 kg class payloads in low earth orbit. 
It employed an open loop guidance (with stored pitch programme) to steer the vehicle in flight along pre-determined trajectory. The first experimental flight of SLV-3, in August 1979, was only partially successful. Apart from the July 1980 launch, there were two more launches held in May 1981 and April 1983, orbiting Rohini satellites carrying remote sensing sensors.

ASLV: 

Augmented Satellite Launch Vehicle (ASLV) was developed to act as a low cost intermediate vehicle to demonstrate and validate critical technologies. With a lift off weight of 40 tonnes, the 23.8 m tall ASLV was configured as a five stage, all-solid propellant vehicle, with a mission of orbiting 150 kg class satellites into 400 km circular orbits. The strap-on stage consisted of two identical 1m diameter solid propellant motors, Under the ASLV programme four developmental flights were conducted. 


The first developmental flight took place on March 24, 1987 and the second on July 13, 1988. ASLV-D3 was successfully launched on May 20, 1992, when SROSS-C (106 kg) was put into an orbit of 255 x 430 km. ASLV-D4, launched on May 4, 1994, orbited SROSS-C2 weighing 106 kg. It had two payloads, Gamma Ray Burst (GRB) Experiment and Retarding Potentio Analyser (RPA) and functioned for seven years. ASLV provided valuable inputs for further development.


The Polar Satellite Launch Vehicle:

The Polar Satellite Launch Vehicle,usually known by its abbreviation PSLV is the first operational launch vehicle of ISRO. PSLV is capable of launching 1600 kg satellites in 620 km sun-synchronous polar orbit and 1050 kg satellite in geo-synchronous transfer orbit. In the standard configuration, it measures 44.4 m tall, with a lift off weight of 295 tonnes. PSLV has four stages using solid and liquid propulsion systems alternately. The first stage is one of the largest solid propellant boosters in the world and carries 139 tonnes of propellant. A cluster of six strap-ons attached to the first stage motor, four of which are ignited on the ground and two are air-lit.

The reliability rate of PSLV has been superb. There had been 21 continuously successful flights of PSLV, till September 2012 . With its variant configurations, PSLV has proved its multi-payload, multi-mission capability in a single launch and its geosynchronous launch capability. In the Chandrayaan-mission, another variant of PSLV with an extended version of strap-on motors, PSOM-XL, the payload haul was enhanced to 1750 kg in 620 km SSPO. PSLV has rightfully earned the status of workhorse launch vehicle of ISRO.

Typical Parameters of PSLV
 Lift-off weight
295 tonne
 Pay Load
1600 kg in to 620 km Polar Orbit,
1060 kg in to Geosynchronous Transfer Orbit (GTO)
 Height
44 metre






PSLV Milestones:



PSLV-C21 launched SPOT 6 and PROITERES on September 09, 2012 (Successful)


PSLV-C19 launched RISAT-1 on April 26, 2012 (Successful)


PSLV-C18 launched Megha-Tropiques, SRMSat, VesselSat-1 and Jugnu on October 12, 2011 (Successful)


PSLV-C17 launched GSAT - 12 on July 15, 2011 (Successful)


PSLV-C16 launched RESOURCESAT - 2, YOUTHSAT and X-SAT on April 20, 2011 (Successful)


PSLV-C15 launched CARTOSAT-2B, ALSAT-2A, NLS 6.1 & 6.2 and STUDSAT on July 12, 2010 (Successful)


PSLV-C14 launched Oceansat - 2 and Six Nanosatellites on September 23, 2009 (Successful)


PSLV-C12 launched RISAT-2 and ANUSAT on April 20, 2009 (Successfully)


PSLV-C11 launched CHANDRAYAAN-I, on October 22, 2008 (Successful)


PSLV-C9 launched CARTOSAT-2A, IMS-1 and Eight nano-satellites on April 28, 2008 (Successful)


PSLV-C10 launched TECSAR on January 23, 2008 (Successful)


PSLV-C8 launched AGILE on April 23, 2007 (Successful)


PSLV-C7 launched CARTOSAT-2, SRE-1, LAPAN-TUBSAT and PEHUENSAT-1 on January 10, 2007 (Successful)


PSLV-C6 launched CARTOSAT-1 and HAMSAT on May 5, 2005 (Successful)


PSLV-C5 launched RESOURCESAT-1(IRS-P6) on October 17, 2003 (Successful)


PSLV-C4 launched KALPANA-1(METSAT) on September 12, 2002 (Successful)


PSLV-C3 launched TES on October 22, 2001 (Successful)


PSLV-C2 launched OCEANSAT(IRS-P4), KITSAT-3 and DLR-TUBSAT on May 26, 1999 (Successful)


PSLV-C1 launched IRS-1D on September 29, 1997 (Successful)


PSLV-D3 launched IRS-P3 on March 21, 1996 (Successful)


PSLV-D2 launched IRS-P2 on October 15, 1994 (Successful)


PSLV-D1 launched IRS-1E on September 20, 1993 (Unsuccessful)

Geosynchronous Satellite Launch Vehicle(GSLV): 

 Mark I&II ,is capable of placing INSAT–II class of satellites (2000 – 2,500 kg) into Geosynchronous Transfer Orbit (GTO).  GSLV is a three stage vehicle GSLV is 49 m tall, with 414 t lift off weight. It has a maximum diameter of 3.4 m at the payload fairing. First stage comprises S125 solid booster with four liquid (L40) strap-ons.  Second stage (GS2) is liquid engine and the third stage (GS3) is a cryo stage.   The vehicle develops a lift off thrust  of 6573 kn. 

The first flight of GSLV took place from SHAR on April 18, 2001 by launching 1540 kg GSAT-1. It was followed by six more launches , GSLV-D2 on May 8, 2003 (GSAT-2  1825 kg), GSLV-F01 on September 20, 2004 (EDUSAT 1950 kg), GSLV-F02 on July 10, 2006, GSLV-F04 on September 2, 2007 (INSAT-4CR   2130 kg), GSLV-D3 on April 15, 2010 and GSLV-F06 on December 25, 2010.


Typical Parameters of GSLV
 Lift-off weight
414 tonne
 Pay Load
2 to 2.5 Tonne in to Geosynchronous Transfer Orbit (GTO)
 Height
49 metre

GSLV Milestones:



GSLV-F06 launched GSAT-5P on December 25, 2010 (Unsuccessful)


GSLV-D3 launched GSAT-4 on April 15, 2010 (Unsuccessful)


GSLV-F04 launched INSAT-4CR on September 2, 2007 (Successful)


GSLV-F02 launched INSAT-4C on July 10, 2006 (Unsuccessful)


GSLV-F01 launched EDUSAT(GSAT-3) on September 20, 2004 (Successful)


GSLV-D2 launched GSAT-2 on May 8, 2003 (Successful)


GSLV-D1 launched GSAT-1 on April 18, 2001 (Successful)


The GSLV-III or Geosynchronous Satellite Launch Vehicle Mark III 

it is a launch vehicle currently under development by the Indian Space Research Organization. GSLV Mk III is conceived and designed to make ISRO fully self reliant in launching heavier communication satellites of INSAT-4 class, which weigh 4500 to 5000  kg. It would also enhance the capability of the country to be a competitive player in the multimillion dollar commercial launch market. The vehicle envisages multi-mission launch capability  for GTO, LEO, Polar and intermediate circular orbits.
GSLV-Mk III is designed to be a three stage vehicle, with 42.4 m tall with a lift off weight of 630 tonnes. First stage comprises two identical S200 Large Solid Booster (LSB) with 200 tonne solid propellant, that are strapped on to the second stage, the L110 re-startable liquid stage. The third stage is the C25 LOX/LH2 cryo stage. The large payload fairing measures 5 m in diameter and can accommodate a payload volume of 100 cu m. The development work on Mk III is progressing as per schedule for a launch in 2012.
Typical Parameters of GSLV Mark III
 Lift-off weight
630 Tonne
 Pay Load
4 Tonne in to Geosynchronous Transfer Orbit (GTO)
 Height
42.4 metre


                                    Anjum Ara IPS
                                 64 RR Batch
       








कोई टिप्पणी नहीं:

एक टिप्पणी भेजें

कुल पेज दृश्य