April 20, 2012
|
:
|
Uranium Corporation of
India Ltd of DAE commissions Uranium mines and processing plant at
Tummalapalle, Andhra Pradesh
|
July 18, 2011
|
:
|
First pour of concrete
at Rajasthan
Atomic Power Station (RAPS), Rawatbhata Unit 7 & 8
|
January 07, 2011
|
:
|
Honourable Prime
Minister of India Dr. Manmohan Singh inaugurated power reactor spent fuel
reprocessing plant (PREFRE II) at BARC, Tarapur and dedicated it to the
Nation. Production started in July 2011
|
December 31, 2010
|
:
|
CIRUS decommissioned and permanently
shutdown on 31.12.2010
|
December 7, 2010
|
:
|
India and France
signed agreement for the fuel supply
|
November 27, 2010
|
:
|
Unit 4 of Kaiga Atomic Power Project achieved first criticality and
synchronised to grid on January 19, 2011
|
June 9, 2010
|
:
|
Plans for establishing Global Centre
for Nuclear Energy Partnership (GCNEP) announced. Establishment of GCNEP was declared on
27 June 2011
|
March 29, 2010
|
:
|
India and USA completed
negotiations on "arrangements and procedures" for reprocessing U.S.
- obligated spent nuclear fuel.
|
March 12, 2010
|
:
|
India & Russia
agreed on a Roadmap for the construction of reactors of Russian design in
India
|
February 11, 2010
|
:
|
India and United
Kingdom sign joint declaration on nuclear cooperation
|
January 23, 2010
|
:
|
Unit 6 of Rajasthan
Atomic Power Station (RAPS) achieved first criticality. It was syncronised to
grid on March 28, 2010 and goes commercial operations on March 31, 2010
|
November 11, 2009
|
:
|
Unit 5 of Rajasthan
Atomic Power Station (RAPS) achieved first criticality. It was syncronised to
grid on December 22, 2009
|
November, 2009
|
:
|
Nuclear Recycle Board
(NRB) formed
|
September 30, 2008
|
:
|
India and France
signed agreement on cooperation for peaceful uses of Nuclear Energy
|
April 7, 2008
|
:
|
Low power critical
facility at Bhabha Atomic Research Centre (BARC) attained first criticality
|
March 13, 2008
|
:
|
DAE and University
Institute of Chemical Technology (UICT), Mumbai signed MoU to establish a new
DAE-UICT Centre for Chemical Engineering Education and Research
|
September 2007
|
:
|
Bhabha Atomic Research
Centre (BARC) and Electronics Corporation of India Limited (ECIL) developed a 32 metre diameter Indian Deep
Space Antenna System – IDSN 32 for providing steering, tracking and science
data reception support for ISRO’s Moon Mission – Chandrayaan – I
|
August 31, 2007
|
:
|
Units 3 & 4 of the Tarapur Atomic
Power Station (TAPS) dedicated
to the Nation
|
1 August, 2007
|
:
|
India and USA signed
agreement on cooperation for peaceful uses of Nuclear Energy
|
June 25, 2007
|
:
|
The first Opencast
Uranium Mine of Uranium Corporation of India Limited (UCIL) was inaugurated at Banduhurang. A Uranium Ore
Processing Plant, also of UCIL inaugurated at Turamdih in Singhbum (East)
district of Jharkhand
|
April 26, 2007
|
:
|
India exported the
first consignment of 720 kg Alfonso and Keasr mangoes to the US after being
irradiated at BARC’s KRUSHAK plant at Lasalgaon, Nashik.
|
February 26, 2007
|
:
|
Unit – 3 of the 220
MWe Kaiga
Atomic Power Project in North Karnataka attained criticality. The
criticality was achieved in less than 5 years, the first pour of concrete
having been done in March 2002. It was syncronised to grid on April 14, 2007
and commercial operations started on May 6, 2007.
|
December, 2006
|
:
|
Dr. APJ Abdul Kalam,
Honourable President of India dedicated Bhabhatron –II to the cancer patients
at the Indian Red Cross Society Cancer (IRCS) Hospital, Nellore
|
August 4, 2006
|
:
|
APSARA the
first nuclear research reactor in the whole of Asia completed 50 years.
|
May 21, 2006
|
:
|
The 540 MWe Unit – 3
of Tarapur Atomic power Project (TAPP – 3) attained criticality. It was
syncronised to grid on June 15, 2006 and goes commercial operations on August
18, 2006.
|
March 2006
|
:
|
Bhabhatron – I, the
first indigenous Teletherapy unit was installed at ACTREC, TMC, Kharghar,
Navi Mumbai
|
December 17, 2005
|
:
|
Centre for Advanced
Technology (CAT) Indore dedicated in the memory of Dr. Raja Ramanna. The
centre was renamed as Raja Ramanna Centre for Advanced Technology (RRCAT).
|
December 5, 2005
|
:
|
India was admitted to
the International Thermo-nuclear Experimental Reactor (ITER) venture. Other
parties in this venture are China, European Union, Japan, South Korea and
United States. India signs agreement on November 21, 2006 to join ITER
project.
|
November 15, 2005
|
:
|
New Supercomputing
facilities building of Computer Centre, BARC was inaugurated at Trombay.
|
June 3, 2005
|
:
|
Homi Bhabha National Institute (HBNI) with a Deemed to be University status has been
established.
|
July 10, 2004
|
:
|
Crystal and Mat
Laboratories was inaugurated at Trombay.
|
2003
|
:
|
1.7 MeV Tandetron
Accelerator and the demo facility Lead Mini Cell (LMC), for reprocessing of
FBTR carbide fuel on lab scale, are commissioned at Indira Gandhi Centre for Atomic Research
(IGCAR).
|
October 22, 2003
|
:
|
Bharatiya Nabhikiya Vidyut Nigam (BHAVINI) was set up at Kalpakkam, Tamil Nadu.
|
November 2002
|
:
|
UCIL's Turumdih Mine,
Jharkhand was inaugurated and Technology Demonstration Pilot Plant becomes operational
at Jaduguda.
|
October 31, 2002
|
:
|
Waste Immobilisation
Plant and Uranium-Thorium Separation Plant(both at Trombay), and the
Radiation Processing Plant Krushak at Lasalgaon, district Nasik, Maharashtra,
are dedicated to the Nation.
|
September18, 2002
|
:
|
First pour of concrete
of Unit-5 of Rajasthan Atomic Power Station (RAPS) 5 &
6.
|
September, 2002
|
:
|
Medical cyclotron
facility of BARC was commissioned at Parel, Mumbai (TMC campus)
|
March 31, 2002
|
:
|
First pour of concrete
of Unit 1 & 2 of Kudankulam Atomic Power Project.
|
March 30, 2002 &
May 10, 2002 |
:
|
First pours of
concrete respectively of Unit-3 and Unit-4 of Kaiga Atomic Power Project 3
& 4.
|
February 12, 2002
|
:
|
India signed the
contract with the Russian Federation for the Nuclear Power Station at
Kudankulam, Tamil Nadu.
|
March 18, 2001
|
:
|
Units 3 & 4 of Rajasthan Atomic
Power Station (RAPS) was dedicated to the nation.
|
November 03, 2000
|
:
|
Unit-4 of Rajasthan Atomic
Power Station (RAPS) attained criticality. It was synchronised to
grid on November 17, 2000 and goes commercial on December 23, 2000.
|
September 26, 2000
|
:
|
Unit-1 of Kaiga Atomic
Power Station attained criticality.
It was synchronised to the grid on October 12, 2000 and goes commercial on
November 16, 2000.
|
May 1, 2000
|
:
|
BARC Safety Council
was formed
|
April 21, 2000
|
:
|
Folded Tandem Ion
Accelerator (FOTIA) delivered first beam on target.
|
March 10, 2000
|
:
|
Unit-3 of Rajasthan Atomic
Power Station (RAPS) synchronised to the grid.
|
March 8, 2000
|
:
|
Tarapur Atomic Power
Station (TAPS)- 3 & 4 rises up.
|
2000
|
:
|
Boron Enrichment Plant
was commissioned at IGCAR, Kalpakkam.
|
January 1, 2000
|
:
|
BRIT's plant for
radiation processing of spices was commissioned at Vashi, Navi Mumbai.
|
December 24, 1999
|
:
|
Unit-3 of Rajasthan
Atomic Power Station attained criticality. It was synchronised to the grid on
March 10, 2000, and becomes commercial on June 1, 2000.
|
October 01, 1999
|
:
|
India’s first Nuclear
Power Plant Simulator was upgraded.
|
September 24, 1999
|
:
|
Unit-2 of Kaiga Atomic
Power Station attained criticality.
It was synchronised to the grid on December 02, 1999, and becomes commercial
on March 16, 2000.
|
July 1999
|
:
|
Solid Storage and
surveillance Facility at Tarapur was commissioned.
|
April 22, 1999
|
:
|
450 MeV Synchrotron
Radiation Source Indus-1 achieved electron beam current of 113 milli-ampere
superceding the design value of 100 milli-ampere.
|
August 10, 1998
|
:
|
The 500 KeV industrial
electron accelerator developed indigenously by the BARC was commissioned for
its first phase of operation.
|
May 27, 1998
|
:
|
Rajasthan Atomic Power
Station (RAPS) Unit-2 was recommissioned after enmasse replacement of coolant
channels.
|
May 11 & 13, 1998
|
:
|
Five underground
nuclear tests were conducted at Pokhran Range,Rajasthan.
|
December 1997
|
:
|
Jadugudda Mill was
expanded to treat 2,090 tonnes ore per day. PRYNCE(95% Neodymium Oxide) Plant
was commissioned at Rare Earths Division.
|
March 31, 1997
|
:
|
Rajasthan Atomic Power
Station (RAPS) Unit-1 was recommissioned after repair of OPRD valve.
|
October 20, 1996
|
:
|
Kalpakkam Mini Reactor
(KAMINI), with Uranium-233 fuel, attained criticality at Indira Gandhi Centre
for Atomic Research, Kalpakkam, Tamilnadu. On September 17, 1997 Research
Reactor KAMINI attained full power level of 30 kWt.
|
March 27, 1996
|
:
|
Kakrapar Atomic Power Station (KARP) was cold commissioned. It was dedicated to
Nation on September 15, 1998.
|
January 995
|
:
|
Narwapahar mine was
inaugurated.
|
August 12, 1993
|
:
|
Technology Offer
Centre was inaugurated at DAE, Mumbai.
|
September 03, 1992
|
:
|
Kakrapar Atomic Power Station (KARP) - Unit I attained criticality. Its Unit II
attained criticality on January 08, 1995
|
May 16, 1991
|
:
|
First ECR heavy ion
source of the country becomes operational at the Variable Energy Cyclotron
Centre.
|
November 09, 1990
|
:
|
Research Reactor PURNIMA-III, a
Uranium-233 fuelled reactor, attained criticality
|
March 12, 1989
|
:
|
Narora Atomic Power
Station Unit I attained criticality. Its Unit II attained criticality on
October 24, 1991
|
March 1, 1989
|
:
|
Board of Radiation and Isotope Technology (BRIT) commenced operations.
|
January 3, 1989
|
:
|
Regional Radiation
Medicine Centre (RRMC) was inaugurated at Kolkata.
|
December 30, 1988
|
:
|
12MV Pelletron
Accelerator was inaugurated.
|
December 1986
|
:
|
Mosabani Uranium
Recovery Plant commissioned.
|
1986
|
:
|
Dredge Mining, Mineral
Separation and Synthetic Rutile Plant at OSCOM, Orissa was
commissioned.
|
October 18, 1985
|
:
|
Fast Breeder Test
Reactor (FBTR) at Kalpakkam attained criticality.
|
August 08, 1985
|
:
|
Research Reactor DHRUVA (100 MWt) attained criticality. It attained
full power on January 17, 1988.
|
March 05, 1985
|
:
|
Waste Immobilisation
Plant (WIP) at Tarapur was commissioned.
|
May 10, 1984
|
:
|
Research Reactor PURNIMA-II, Uranium-233 fuelled homogenous reactor,
attained criticality.
|
March 08, 1984
|
:
|
Plutonium- Uranium
mixed Carbide Fuel for fast breeder test reactor was fabricated in BARC.
|
February 19, 1984
|
:
|
Centre for Advanced
Technology at Indore( Madhya Pradesh) inaugurated and later renamed by
Honourable Prime Minister, Dr. Manmohan Singh on December, 17 2005 to Raja Ramanna
Centre for Advanced Technology (RRCAT)
|
January 27, 1984
|
:
|
Madras Atomic Power
Station - Unit I at Kalpakkam started commercial operation. Unit II goes
commercial on March 21, 1986.
|
November 15, 1983
|
:
|
Atomic Energy Regulatory Board (AERB) was constituted.
|
February,1983
|
:
|
Rakha Uranium Recovery
Plant of Uranium Corporation of India Limited (UCIL) was commissioned.
|
November 19, 1982
|
:
|
Power Reactor Fuel
Reprocessing Plant at Tarapur was commissioned.
|
November 18, 1979
|
:
|
Plutonium-Uranium
mixed oxide fuel was fabricated at Trombay
|
June 16, 1977
|
:
|
Variable Energy
Cyclotron becomes operational at Variable Energy Cyclotron Centre (VECC) Kolkata.
|
September 1975
|
:
|
Surda Uranium Recovery
Plant of Uranium Corporation of India Limited (UCIL) was commissioned.
|
May 1975
|
:
|
Commercial production
of by-products - Molybdenum and Copper concentrates started
|
March 1975
|
:
|
Commercial production
of Uranium Mineral Concentrates from Copper plant tailings at Surda,
Hindustan Copper Limited commenced.
|
May 18, 1974
|
:
|
Peaceful underground
Nuclear Experiment was conducted at Pokhran, Rajasthan.
|
1974
|
:
|
Radiation
sterilisation plant (ISOMED) commenced at Trombay
|
1974
|
:
|
By-product Recovery
Plant of Uranium Corporation of India Limited (UCIL) at Jaduguda was commissioned.
|
November 30, 1972
|
:
|
Unit-1 of Rajasthan
Atomic Power Station at Kota began commercial operation. Unit II goes
commercial on November 1, 1980.
|
May 18, 1972
|
:
|
Research Reactor PURNIMA-I attained criticality.
|
February 3, 1972
|
:
|
Formation of DAE
Safety Review Committee
|
February18, 1971
|
:
|
Plutonium fuel for
Research Reactor PURNIMA-I
was fabricated at Trombay
|
September 06, 1970
|
:
|
Uranium-233 was
Separated from irradiated thorium
|
October 02, 1969
|
:
|
Rajasthan Atomic Power
Station (RAPS) starts commercial operation.
|
May 01, 1969
|
:
|
Heavy Water Projects
was constituted. Later, it becomes Heavy Water Board.
|
March 12, 1969
|
:
|
Reactor Research
Centre was started at Kalpakkam. Renamed as Indira Gandhi Centre for Atomic Research
(IGCAR). on December 18, 1985.
|
December 31, 1968
|
:
|
Nuclear Fuel Complex (NFC) was set up at Hyderabad.
|
May 1968
|
:
|
Uranium Mill at
Jaduguda, with a capacity of 1,000 TPD, commenced commercial production of
Magnesium diuranate (yellowcake). Jaduguda Mine Shaft was commissioned in
November 1968.
|
October 04, 1967
|
:
|
Uranium Corporation of
India Limited (UCIL) was established with headquarters at Jaduguda for mining
and milling of uranium ores.
|
June 1, 1967
|
:
|
Formation of Power
Projects Engineering Division, Mumbai, which was subsequently converted to
Nuclear Power Board on August 17, 1984. It became as Nuclear Power
Corporation of India Limited on September 17,1987.
|
April 11, 1967
|
:
|
Electronics
Corporation of India Limited was set up at Hyderabad for producing electronic
systems, instruments and components.
|
January 22, 1967
|
:
|
Atomic Energy
Establishment Trombay (AEET) was renamed as Bhabha Atomic Research Centre.
|
January 22, 1965
|
:
|
Plutonium Plant was
inaugurated.
|
January 14, 1961
|
:
|
Research Reactor ZERLINA attained
criticality. It was decommissioned in 1983
|
July 10, 1960
|
:
|
CIRUS – the 40 MWt research
reactor attained criticality.
|
February 19, 1960
|
:
|
First lot of 10 Fuel
Elements for CIRUS reactor was fabricated at Trombay
|
January 30, 1959
|
:
|
Uranium Metal Plant at
Trombay started production
|
August 19, 1957
|
:
|
Atomic Energy
Establishment Training School started functioning.
|
January 20, 1957
|
:
|
Atomic Energy
Establishment, Trombay (AEET) was inaugurated
|
August 04, 1956
|
:
|
APSARA - first
research reactor in Asia, attained criticality at Trombay, Mumbai.
|
August 01, 1955
|
:
|
Thorium Plant at
Trombay goes into production.
|
August 03, 1954
|
:
|
Department of Atomic
Energy was created.
|
December 24, 1952
|
:
|
Rare Earths Plant of
IRE at Alwaye, Kerala, was dedicated to the nation and production of Rare
Earths & Thorium - Uranium concentrate commenced.
|
April, 1951
|
:
|
Uranium Deposit at
Jaduguda was discovered by AMD. Drilling operations commenced in December
1951.
|
August 18, 1950
|
:
|
Indian Rare Earths
Limited was set up for recovering minerals, processing of rare earths
compounds and Thorium - Uranium concentrates.
|
July 29, 1949
|
:
|
Rare Minerals Survey
Unit was set up. Later, this unit becomes Atomic Minerals Division. It was
renamed as Atomic Minerals Directorate for Exploration and Research on July
29, 1998.
|
August 10, 1948
|
:
|
The Atomic Energy
Commission was constituted.
|
April 15, 1948
|
:
|
Atomic Energy Act was
passed
|
December 19, 1945
|
:
|
Tata Institute of Fundamental Research (TIFR) , Mumbai was inaugurated.
|
March 12, 1944
|
:
|
Dr. Homi Jehangir
Bhabha writes to Sir Dorabji Tata Trust for starting Nuclear Research in
India.
|
IAS Charisma is a brainchild of Dr. Kumar Ashutosh, a Ph.D. in History, PGDM(Marketing) and Double M.A.(History and Philosophy), an IAS aspirant himself, he cleared IAS Mains twice and faced IAS interview before starting on this journey of guiding future IAS aspirants to help them in tackling with the problems that he had to face during IAS preparation. IAS Charisma is an endeavor to light a candle for IAS aspirants who sometimes get lost in commercialization of education.
गुरुवार, 3 जनवरी 2013
Atomic Energy: Milestones in India
सदस्यता लें
टिप्पणियाँ भेजें (Atom)
कुल पेज दृश्य
लेबल
- Indian History (1)
- कार्य निष्पादन योजना (1)
- भारतीय रेल (1)
- साफ-सफाई (1)
कोई टिप्पणी नहीं:
एक टिप्पणी भेजें